Categories
Contact Us

Tops Timber And Veneers Limited
Add:Suite 810, No. 111 Changjiang Road, Nanjing 210005, China
Tel:+86-25-85438021
Mobile:+86-13951913207
Contact:Hugh Young
E-mail:hugh@topstimber.com
Contact:Xinping Xu
E-mail:xpxu@topstimber.com

News
Home > News > Content
The Installation Process Of The Decoration Panel
Jan 22, 2018

(1) Stone Panel installation

1 grouting method. Plate in place, drilled or slotted----plate installation-----Gar correction, fixed----layered grouting----seam treatment----treatment, maintenance----inspection, acceptance.

2) Paste method. Grass-roots treatment---plastering---elastic line, block----inlay----cleaning, protection----inspection, acceptance

3 Dry Hanging method. Measurement of the wiring---installation of connectors----an decorative panel---caulking, cleaning----inspection, acceptance

(2) Metal Decoration Panel Installation

Measurement of line---installation skeleton or base plate---an decorative panel---seam or shell----inspection, acceptance.


  • Newsletter
  • Categories
  • Contact Us

    Tops Timber And Veneers Limited
    Add:Suite 810, No. 111 Changjiang Road, Nanjing 210005, China
    Tel:+86-25-85438021
    Mobile:+86-13951913207
    Contact:Hugh Young
    E-mail:hugh@topstimber.com
    Contact:Xinping Xu
    E-mail:xpxu@topstimber.com

  • QR Code
  • Copyright © Tops Timber and Veneers Limited All Rights Reserved.